Prefab Homes Examples-manufacture,factory,supplier from China

(Total 24 Products for Prefab Homes Examples)
   A steel truss for houses began to appear in the last 4-5 years. Previously, conventional steel material had been widely used, but for industrial construction.   A conventional steel structure is known for strong and has high durability. This structure allows the building to be made with a wide span. The steel used for construction is generally I-shaped and tied each other using the dynabolt system.    The original steel material is black. The color of steel sold on the market is generally given further treatment.
  Contacta ahora
Basic InstructionShandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018.
  Contacta ahora
They have lots of advantages:Energy saving and environmental protection, using light steel, can be recycled 100%, breaking the traditional demolition and construction pollution;  Windproof and seismic, steel structure housing has high seismic performance, can withstand hurricanes and snowstorms and other natural disasters;  Sound insulation and fire prevention;  High aluminized zinc material, strong corrosion resistance, structural life is much longer than brick and concrete buildings;  Save time limit;  The construction environment is less affected by climate conditio
  Contacta ahora
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contacta ahora
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contacta ahora
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
  Contacta ahora
Basic InstructionRonald lwakatare, leader government of tanzania's rapid transit authority, said that they had obtained $148.1 million for segment iii and $99.9 million for segment iv. "the finances acquired will contribute to the actual construction of brt infrastructure, and the government might be chargeable for compensating individuals who could be affected by the challenge," he stated.
  Contacta ahora
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
  Contacta ahora
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contacta ahora
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contacta ahora
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contacta ahora
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contacta ahora
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contacta ahora
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contacta ahora
InstructionImportant heating, iron and metal companies and thermal power plants in city iciness are large-scale coal-fired production, which has grow to be the supply of air pollutants. in latest years, all localities have adopted active environmental protection guidelines.
  Contacta ahora
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contacta ahora
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contacta ahora
Assembled steel structure:Assembled steel structure, also known as modular steel structures, offer several advantages in the field of construction. The detailed advantages of Assembled steel structure in buildings are as follows: pre-assembled in a factory-controlled environment, allowing for faster construction.
  Contacta ahora
IntroduceFlue gasoline desulfurization and denitration era is a boiler flue gas purification technology implemented to the chemical enterprise of multi nitrogen oxide and sulfur oxide era. nitrogen oxides and sulfur oxides are one of the predominant resources of air pollution. therefore, the utility of this era has many benefits for ambient air purification.
  Contacta ahora
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
  Contacta ahora
InstructionFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
  Contacta ahora
InstructionImportant heating, iron and metal businesses and thermal strength flowers in town iciness are huge-scale coal-fired manufacturing, which has grow to be the supply of air pollutants. in state-of-the-art years, all localities have adopted energetic environmental protection pointers.
  Contacta ahora
InstructionCentral heating, iron and metal organizations and thermal electricity flowers in urban wintry weather are large-scale coal-fired production, which has grow to be the supply of air pollution. in recent years, all localities have followed active environmental safety policies.
  Contacta ahora
Relate News
Economic systemThe metal shape building makes use of superior design and processing generation and large-scale production methods so that the fee may be considerably reduced. simultaneously, the simple and speedy installation saves many production charges and permits corporations or builders to put it into production extra quick.Conventional bolstered concrete homes have a excessive value of civil production and long production intervals.
1. The portal body structure is a form of a closed structural system. it has a simple pressure, clean force transmission course, and fast creation pace. the introduction of a portal frame shape strengthens the bonding homes of partitions and generates extra flexible area layouts, as a consequence offering extra opportunities for engineering creativity.2. Metallic constructing body structures are used to assemble excessive-upward push and superb excessive-upward push buildings, multi-tale homes, and business office homes. with the power of its shape.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
    In November, the group signed the first phase of the BRT station project in dar es Salaam, Tanzania, which will become another bright spot in the international trade of the Group after its completion.    The group will take this as an opportunity to strengthen foreign exchanges and cooperation, actively docking the international trade market, fully open the domestic and foreign "double good" situation, for the realization of the group "double hundred goals" to create a new trend!
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part
    Jointly sponsored by Shandong Housing and Urban-Rural Development Department and Jinan Municipal People's Government, jointly undertaken by Jinan Housing and Urban-Rural Development Bureau and Jinan New And Old Energy Conversion Zone, the 5th Shandong Green Building and Building Energy Saving New Technology Products Expo was grandly opened in Shandong International Convention and Exhibition Center.     "Promote green development in urban and rural areas and create a better and livable life".
From August 10 to 12, 2021, representatives of African Development Bank, Tanzania Ministry of Finance, BRT Authority of Tanzania Economic capital And Tanzania Highway Authority, owner of the project, visited the BRT-2 Phase 1 project of Tanzania for a three-day evaluation and inspection. The investigation team inspected the construction of the bridge, asphalt concrete pavement and bus station under construction, and listened to the detailed report of the project leader on the progress of the project and the difficulties faced at present.
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
Expanded creation scheduleFabricated off-website online with geometrically controlled system, structural metal has the benefit of being prepared to erect as soon as it reaches the bridge site. reinforcement and formwork set up is not required. structural metal erection isn't limited to a specific temperature range. structural metal is frequently lighter than different materials for the identical span, ensuing in smaller or fewer erection cranes.
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.